Concrete Calculator
US & CanadaEnter your measurements in feet or metres. You get the volume in cubic yards and cubic metres, plus how many bags that is, including the 30 kg bags sold in Canada.
Work out your concrete
Concrete needed
0 cubic yards
0 cubic metres · 0 cubic feet
Or buy bags
| Bag | Bags | Pallets | Sold in |
|---|
Yields are the typical figures printed on ready-mix bags. Check the bag you are buying, because brands differ.
How the calculation works
Concrete is sold by volume, so every one of these pours comes down to the same thing: work out the space you are filling, then convert it into the units your supplier uses.
Slabs and footings
A slab is a box. Multiply the three measurements, keeping them all in the same unit, then convert:
- Cubic feet = length (ft) × width (ft) × thickness (ft)
- Cubic yards = cubic feet ÷ 27
- Cubic metres = cubic feet ÷ 35.31
Thickness is the step people get wrong. A 4 inch slab is 4 ÷ 12 = 0.333 ft, not 4. And a cubic yard is 27 cubic feet, not 3. It is a cube three feet on every side.
Sonotube footings and round columns
A tube is a cylinder, so the diameter gets halved and squared:
- Cubic feet = π × (diameter in ft ÷ 2)² × height (ft)
Doubling the diameter quadruples the concrete. A 12 inch tube takes four times as much as a 6 inch one at the same depth, which is why the jump from a 10 to a 12 inch tube costs more than it looks.
Post holes
A post hole is a cylinder with the post taking up part of it. The calculator subtracts the post, using its real dressed size rather than its name. A 4×4 is actually 3½ inches across, and a 6×6 is 5½.
Concrete for common slab sizes
Volumes include a 10% waste allowance, and bag counts are rounded up to whole bags.
| Slab | Thickness | Cubic yards | Cubic metres | 80 lb bags | 60 lb bags | 30 kg bags |
|---|---|---|---|---|---|---|
| 8 × 8 ft | 4" | 0.87 | 0.66 | 40 | 53 | 53 |
| 8 × 8 ft | 6" | 1.3 | 1 | 59 | 79 | 79 |
| 10 × 10 ft | 4" | 1.36 | 1.04 | 62 | 82 | 82 |
| 10 × 10 ft | 6" | 2.04 | 1.56 | 92 | 123 | 123 |
| 10 × 12 ft | 4" | 1.63 | 1.25 | 74 | 98 | 98 |
| 10 × 12 ft | 6" | 2.44 | 1.87 | 110 | 147 | 147 |
| 12 × 12 ft | 4" | 1.96 | 1.5 | 88 | 118 | 118 |
| 12 × 12 ft | 6" | 2.93 | 2.24 | 132 | 176 | 177 |
| 10 × 16 ft | 4" | 2.17 | 1.66 | 98 | 131 | 131 |
| 10 × 16 ft | 6" | 3.26 | 2.49 | 147 | 196 | 196 |
| 12 × 16 ft | 4" | 2.61 | 1.99 | 118 | 157 | 157 |
| 12 × 16 ft | 6" | 3.91 | 2.99 | 176 | 235 | 236 |
| 16 × 20 ft | 4" | 4.35 | 3.32 | 196 | 261 | 262 |
| 16 × 20 ft | 6" | 6.52 | 4.98 | 294 | 392 | 392 |
| 20 × 20 ft | 4" | 5.43 | 4.15 | 245 | 326 | 327 |
| 20 × 20 ft | 6" | 8.15 | 6.23 | 367 | 489 | 490 |
| 24 × 24 ft | 4" | 7.82 | 5.98 | 352 | 470 | 471 |
| 24 × 24 ft | 6" | 11.73 | 8.97 | 528 | 704 | 706 |
Concrete per sonotube footing
One footing, including 10% waste. Multiply by how many you are pouring.
| Tube | Depth | Cubic feet | Cubic metres | 80 lb bags | 60 lb bags | 30 kg bags |
|---|---|---|---|---|---|---|
| 8" tube | 3 ft | 1.15 | 0.03 | 2 | 3 | 3 |
| 8" tube | 4 ft | 1.54 | 0.04 | 3 | 4 | 4 |
| 10" tube | 3 ft | 1.8 | 0.05 | 3 | 4 | 5 |
| 10" tube | 4 ft | 2.4 | 0.07 | 4 | 6 | 6 |
| 12" tube | 3 ft | 2.59 | 0.07 | 5 | 6 | 6 |
| 12" tube | 4 ft | 3.46 | 0.1 | 6 | 8 | 8 |
| 16" tube | 3 ft | 4.61 | 0.13 | 8 | 11 | 11 |
| 16" tube | 4 ft | 6.14 | 0.17 | 11 | 14 | 14 |
| 18" tube | 3 ft | 5.83 | 0.17 | 10 | 13 | 13 |
| 18" tube | 4 ft | 7.78 | 0.22 | 13 | 18 | 18 |
| 24" tube | 3 ft | 10.37 | 0.29 | 18 | 24 | 24 |
| 24" tube | 4 ft | 13.82 | 0.39 | 24 | 31 | 31 |
Pouring in Canada? Footings have to reach below the frost line, and that depth changes a lot between provinces, and so does the tube size your municipality will accept. Work out the depth first, then come back and price the concrete.
Bags per cubic yard and cubic metre
| Bag | Yield (cu ft) | Per cubic yard | Per cubic metre | Per pallet | Sold in |
|---|---|---|---|---|---|
| 40 lb | 0.3 | 90 | 118 | 80 | US |
| 50 lb | 0.375 | 72 | 94 | n/a | US |
| 60 lb | 0.45 | 60 | 78 | 56 | Both |
| 80 lb | 0.6 | 45 | 59 | 42 | Both |
| 25 kg | 0.374 | 72 | 94 | n/a | Canada |
| 30 kg | 0.449 | 60 | 79 | n/a | Canada |
Yields are the typical figures printed on standard ready-mix bags. Pallet counts are typical retail quantities and vary by brand, so confirm with your supplier. "n/a" means we could not confirm a standard count.
Before you pour
- Order in whole or half yards. Ready-mix suppliers rarely sell odd fractions, and most have a minimum charge.
- Mixing more than about 25 bags by hand is a long day. Past that, hire a mixer or switch to ready-mix.
- Compact the base first. Soft spots let the slab sink and crack, and they quietly swallow extra concrete.
- Rebar and mesh are not in these numbers. Most slabs and structural footings need reinforcement. Check what your local code requires.
- Have everything ready before the first bag opens. A pour that stops part-way leaves a cold joint, which is a permanent weak line.
These are estimates to help you buy materials. Footing sizes, depths and reinforcement are set by your local building code. Confirm them with your building department or an engineer before you dig.